Inspection & Reporting Workflows

Turnaround, backlog and rework: metrics for survey and CE practices

How Motor Survey firms and Chartered Engineering practices can define turnaround, backlog and rework so the numbers match IRDAI timelines and port realities.

By Techkrate Editorial TeamUpdated 2 min read

Key takeaways

  • Define each metric precisely, with a clear start event, end event and what counts.
  • For motor surveys, measure turnaround from allocation to report submission, the window IRDAI’s 2024 Master Circular sets at 15 days.
  • Backlog should show what each open job is waiting on, not just how many there are.
  • Rework, such as reports sent back for correction, is often the most useful quality signal a practice has.

Every practice owner wants to know how the work is going. Are reports going out on time? Is the backlog growing? Is quality slipping? The numbers that answer those questions are only useful if everyone agrees what they mean. This guide defines three metrics for motor survey firms and Chartered Engineering practices.

Turnaround

Turnaround is the time from a defined start event to a defined end event. The trouble is that people pick different events without saying so.

For motor surveys, the natural definition follows the regulator. IRDAI’s Master Circular on General Insurance Business (June 2024) expects the survey report within 15 days of the surveyor’s allocation. So measure:

  • start: the date and time the surveyor was allocated
  • end: the date and time the survey report was submitted to the insurer

You can also track sub-steps, such as allocation to inspection, or inspection to receipt of the repairer’s estimate. These show where the days actually go.

For Chartered Engineering, turnaround depends on the job type. For port inspections of used machinery, a useful definition is from the date the consignment was ready for inspection to the date the signed report was issued. Waiting time caused by missing documents should be recorded separately, so the practice can see how much delay is outside its control.

Backlog

A backlog count on its own says little. Fifty open claims could be healthy or alarming depending on what they are waiting for. A useful backlog view shows each open job with:

  • how long it has been open
  • its current stage
  • what it is waiting on: the insured, the repairer, the client, the engineer’s review or internal approval

For survey firms, add how close each claim is to its 15-day window. For CE practices, add which consignments are at a port and accruing charges.

Rework

Rework is any time a job goes backwards. A report returned by an insurer for correction. A certificate reissued because a serial number was wrong. A valuation revised after a query.

Rework is the clearest quality signal most practices have, and it is often not tracked at all. Record every instance with a short reason. Over a few months, patterns appear: one report section that keeps generating queries, one type of estimate that keeps being misread, one stage where details are commonly mistyped.

Make the definitions visible

Write each definition down and show it next to the number. “Turnaround: allocation to report submission, calendar days” leaves no room for argument. When definitions change, note the date, so trends are not distorted.

Let the system count

Metrics built by hand from a spreadsheet are slow and easy to dispute. When each claim or consignment lives in one record with timestamps for allocation, inspection, submission and approval, the numbers come from the work itself.

Techkrate builds MOVAL and CARS around a single record per job, so stage dates are captured as the work happens rather than reconstructed later.

Frequently asked questions

Should we measure turnaround in calendar days or working days?

Use calendar days when comparing against regulatory windows expressed that way, and state the basis clearly on every report or dashboard.

What is a healthy rework rate?

There is no universal figure. Track your own rate over time and by job type, and investigate any rise.

When should turnaround start for a motor survey?

From allocation. The 2024 Master Circular counts the survey report window from allocation, so measuring from the same point lets you compare against the 15-day expectation.

What counts as backlog?

Open jobs older than an agreed threshold for their type. Define the threshold per job type so the number means the same thing across offices.

Regulatory references were checked at the time of writing. Rules change, so confirm against the current official text before relying on them. This article is general information, not legal advice.